Showing posts sorted by date for query campbellford. Sort by relevance Show all posts
Showing posts sorted by date for query campbellford. Sort by relevance Show all posts

Sunday, 26 July 2026

Pickering Community Skatepark Ground Breaking

Pickering Community Skatepark 

Ground Breaking

After driving 18 hours home from PEI for the ground breaking, it was postponed due to poor weather.
A few days later, we showed up for the ground breaking ceremony.  Radius Skateparks (Angus Glen, Elmira, Campbellford) is on site.  Landscaping will take place following construction and the plan is to have the park open in October.
Good picture.

Better Picture with Russ, Jia, Brian Savard (Radius Prez and skatepark builder extrodinaré), city staff and council, Me, Arnold (our parks guy) & Matt.

Chatting about the long road with Pickering CAO Marisa Carpino

Mayor Kevin Ashe's remarks



Saturday, 27 June 2026

Upcoming Events - Summer 2026

Upcoming Events - Summer 2026

It's Summer and contests are happening and new Skateparks are opening. The 15th Hoedown at the Hoof went down last week and Waterdown Ribfest Jam is happening today.

What Else? Here's what I know.

July 6 - Grand Opening & Ribbon Cutting Ceremony opening Earl Bales Skatepark. It's open and great.

July 10-12 - Jackalope Fest Mississauga.  A free Skateboarding and action sports festival at Square One Shopping Centre in Parking Lot 3 near Celebration Square (fifa watching happening there).

July 10 - Arnprior's new skatepark is having their Grand Opening.

July 15 - Kincardine All Wheel opens to the public. Grand opening TBA.

July 18 - Tecumseh Skate Jam (Sarnia).
July 19 - Campbellford Skate Comp (rescheduled due to rain & smoke)
July 18-19 - 33rd Annual Beasley Park Skate Jamboree in Hamilton.

July 24 - Groundbreaking Ceremony for Pickering Community Skatepark @ 12pm.

July 25 - Sanction 'Roll Call' jam at Earl Bales 1-4.

Aug 15 - West Shore Skate Spot Jam - Pickering's Holding a Non-test with food and fun.

Aug 16 - Kincardine Skatepark Grand Opening @ 1pm.

Aug 22 - Ash Bowl Bash. The annual bowl comp at Ashbridges Bay returns.

Sept 12th - Whitby's Fieldgate Sport Complex Skatepark is set to open.

Belle River has an upgrade.

Sept 1 - HALP in Queensville has announced outdoor amenities will open the week after Canada Day.  Skatepark and Pump Track are now delayed with some outdoor amenities opening July 10. 

Follow the 'NEW PARKS' page for all the projects I keep tabs on in Ontario.

Friday, 30 January 2026

Pickering Community Skatepark Design Sesh #2

Pickering Community Skatepark Design Sesh #2

 Deets Below.


After 10+ years of Advocacy, the core of Pickering is getting a modern skatepark. I had an online meeting with city staff as well as Brian Savard, President & Director of Construction for Radius Skateparks, and Jim Barnum, Senior Designer & Project Manager for Radius Skateparks. 
BTW, if you don't know these guys, they've been responsible for ABB, Elmira, Campbellford, Haliburton and more.
I was asked to keep the concept secret until Radius has a 3d render ready for the public. 
We went over all the details and I was asked for feedback. 
5 emails of photos, designs, doodles and suggestions later, we have our second meeting set.

To find out how we got here click HERE

Saturday, 5 October 2024

Seaton Rec Complex - Part 2

 Seaton Rec Complex - Part 2

Three concepts for the interior of the Seaton Rec Complex & Library are now out for public survey.  You can check them out in more detail & fill out the survey HERE.

The complex features gyms, pool, library etc.  There are a number of exterior features that are included with placeholder images for the playground, splash pad and SKATEBOARD PARK.

If you know me, you know how embedded I am when it comes to skateparks, especially in Pickering.  The Seaton development was included in the 2017 Pickering Skateboard Park Strategy. It calls for a Community Skatepark (~2500Sqm) in Seaton with the map indicating the Seaton Rec Complex being the proposed location with other smaller spots/dots in other smaller Seaton parks (Page 15).

I have an issue with the size of the placeholder 'SKATEBOARD PARK'.  The small space set aside to the skatepark appears to be about half the size of the nearby basketball court. From The Strategy, we know that a basketball half court is the foot print of a Skate Spot.

If the city has changed direction with the All-wheels Park facility at Seaton Rec Complex, they haven't made their stakeholders aware of this change in direction.

I have been told, and it's been documented, that Seaton Rec with have a Community Sized All-wheels park. Heck, I'd settle for a Neighbourhood Sized Skatepark. 

The Stakeholders Meeting email I received includes 'All-wheels park' but the concepts and recent Video allude to or state 'skate spot'


Enough Venting About Size

Let's discuss what Pickering needs.

Pickering needs a large skatepark with a bowl, mini-ramp & a quality pump track.  As the Rec & Parks 10 Year Plan States - 

 All-wheels parks (skateboarding, scootering, BMX biking, inline skating), skateboard parks, and pump tracks are now a standard level of service in most municipalities. (page E-18). 


Here are some examples of modern All-Wheels facilities that are meeting the needs of local users in other communities.

Whitby Sport ComplexThe Future Whitby Sports Complex will feature a a modern skatepark with a full 'street style' section with standard and sculptural obstacles, a full bowl and pump track.  Estimated to be complete in late 2025, this facility will add to Whitby's network of old and modern skateparks.


The small town of Waterford, ON opened their new skatepark in 2024. It features a large bowl, jump ramp and big wall as well as the typical skatepark features.  The large features cater to to local BMX and Scooter skatepark users that are the primary local users.  (~10000SqFt.  Pop. ~4500)

TelMax Skatepark - Newmarket
Newmarket's first outdoor skatepark has all the amenities that skatepark users desire and more.  There are 2 shaded seating areas, a solar powered charging station and a water station.  Lighting is planned with the electrical infrastructure installed during the build.  TelMax secured the sponsorship rights and the park has been adorned with branding in a way that didn't affect the riding surface.  Skate features include a learners area, bowl and various sizes of ledges, rails and ramps.

I feel pretty safe saying that THIS is what skatepark users expect.  This large park includes all the basic features in various sizes, a decent bowl and access to the other rec centre amenities.  The addition of the skatable AJAX sculpture is a bonus.  The minor drawbacks of this park is the construction. It was designed by Spectrum Skateparks but built by the general contractor UCC Group.  Some of the finer features that a skatepark specialist would have noticed were missed such as the blending of the flat to transition of the bowl.  UCC has become better with experience but Skatepark Specialists are better.

Pefferlaw Skatepark and Pump Track
Pefferlaw (Pop. ~3000) opened their All-wheels facility earlier this year (2024). The Skatepark is simple but has all the features users need and enough tweaks to make the park stand out and add challenge.  The pump track is fantastic and the whole park is lit for evening use.

Another small town with a new skatepark in Wellesley, ON.  After several skatepark failures, the Township finally hired the right company which resulted in a quality, Neighbourhood Sized Skatepark.

Halton Hills, ON has a fantastic Action Sports Network with continual plans to expand. Gellert Skatepark features a large bowl, mini-bowl and large street section. Halton Hills created their Action Sport Needs Assessment in 2017 (the same year Pickering approved The Pickering Skateboard Park Strategy) and in that time they have created the Gellert Skatepark, made plans for additional skate spots,  replaced 3 Muskatears Skatepark in Acton after an arena expansion & replaced their old Victor Ford Era skatepark at Mold-Masters Arena. Pickering, in that same amount of time, has built ONE skate spot and mismanaged skateboarding programming.


Sixteen Mile Skatepark, Oakville
The new Sixteen Mile Sports Complex in Oakville includes a large skatepark with a pump track and competition level bowl.  Oakville had a history of installing skateparks with prefabricated ramps that have broken down over time. Their most recent additions to the action sports network have all been poured in place concrete including the Cornwall Rd Skate Spot.  It is a flowy, moonscape style bowl that would work well in lieu of a pump track.


With Skateboarding and BMX included in the Summer Olympic Games, the demand for skatepark information has increased.  The latest modern All-wheels facilities are being designed with progression in mind.  They feature solid obstacles that can be utilized by all skill levels and groups.  

The Olympic Skateboarding Events are broken down into two categories for both Men & Women.  Skateboarding Park takes place in a Transition Park/Bowl consisting mostly of different sized quarter pipe with extensions, gaps and rails.  Skateboarding Street takes place in a Street Style skatepark with a focus on Stairs, rails, hubbas (angled ledges) and gaps.  Canadian athletes have participated in both Park and Street. 

The All-wheels park users of Pickering are excited about the possibility of a high quality skatepark that will allow for progression while catering to all skill levels.  There is a lack of transition in Pickering. The only quality quarter pipe in Pickering is at the West Shore Skate Spot and at 5ft, it is perfect for experienced skaters but is a little too large to learn on. 

I have been contacted by Pickering Staff in the past regarding skateparks and have supplied information included in the 2017 Pickering Skateboard Park Strategy, The West Shore Skate Spot and Advocating for 10 years.  The Public often contacts me about skatepark projects in Pickering and the rest of Ontario.  I've previously posted those requests HERE, on a previous article about Seaton Rec.  Several of those requests include a large flat area for learning, roller skating and surf skating.  The original Vaughan Park is 'V' shaped, leading to a large flat area that is used as an Ice Skating path in the winter.  There is a place holder Skate Path in the Seaton Concepts.


So what's next.  

Pickering's next all-wheels park needs to be designed and built by a company that specializes in Skatepark Design and Construction.  General Contractors and Engineering Firms simply don't have the experience to produce quality skateparks.  Additionally,  the companies recent work should be inspected whenever possible and user feedback should be taken into account.

Canada has many Skatepark Specialists to choose from with staff who skateboard or BMX and understand skateparks.  NewLine skateparks has been a leader in Canadian skateparks for 20years. Radius Skateparks created my favourite skatepark, Campbellford.  Pickering successfully worked with Transition Construction on a Design/Build Contract for the West Shore Skate Spot.  Papillion Skateparks from Quebec has started building amazing parks in Ontario. Drop-in Skateparks from Manitoba have started contracts here as well.  There are a number of American and International Design/Build firms Pickering should approach for a competitive Bid.  These include Grindline, Spohn Ranch, Beaver Concrete and many more.

Turtle island feature at the Akwesasne Skatepark by Papillion Skateparks

One company I must object to in the strongest possible terms is Canadian Ramp Company.  Their work is consistently underwhelming, leaving the local skatepark users dismayed.  A recent project (July 2024 - Sonny Belch Skate Spot) has already had a major re-build of its central feature.  Their Aurora Family Leisure Complex project was found to be structurally deficient and a complete re-build was recommended.  I have kept a stringent record of CRC and all Ontario skatepark Design/Builders which can be found HERE.

Modern skatepark are amazing works of sculptural and structural concrete.  Skaters appreciate an aesthetically beautiful park but demand quality in their skate facilities.

Wednesday, 28 December 2022

 Scott,

Since you've skated more skateparks than most, I wanted to ask you if you'd participate in a little article survey. I want to know what you think the 5-10 most groundbreaking designs in skateparks would be?


It can be new or old. I want to have the lead of the article/survey be skaters who have skated hundreds of parks offering up their favorite innovations then have a worldwide survey open to everyone.


Jeff


Hey Jeff,

I’d love to give you my 2cents. As of last weekend, I’ve been to 500+ skateparks across Canada and a few in the US.


I’d be happy to break down some of my favourite parks, designs and features for you and explain why I find them groundbreaking.


  1. I’ll start with my single favourite skatepark; Campbellford, Ontario.   The park isn’t huge but it does have a variety of obstacles and the bowl has plenty of features.  One of the things that sets the park apart is the use of real and faux stone finishes. 



This ledge has stone and metal edges and is supported by rocks found during the digging of the bowl.


Great use of real and faux stone.


This gem is located in a beautiful park with a community centre, washrooms, playground, splash pad & sports fields. The skatepark uses aspects of the river near the park including polished granite ledges, stone features and custom concrete work.


Another feature I loved is the Friendly locals. Not only this turtle but town residents. The first time I visited Campbellford in October of 2010 I did a quick recon of the park and returned to my car for some wax. While waxing a ledge an older gentleman approached me and what I thought of the park. 

"I just got here but it looks pretty nice." I replied.

"Yeah well I think it's great. The missus and I moved here from Port Hope after I retired and the kids love the park there and we thought there should be a park here cause it's great and it gives the kids something to do besides drugs." 

I was floored at such a positive response.


2. The Forks Plaza, Winnipeg, MB

The Forks Plaza is so plaza-ey that tourists have been known to stroll through the entire park, disrupting skaters, not realizing it's a skatepark. Only when they make it through the entire plaza and reach the competition level bowl do they discover that it is, in fact, purpose built for skateboarding.


Admittedly, The Forks Plaza was designed to blend in to The Forks area of Winnipeg. The Forks is the Historical, Cultural and Tourist hub of the city featuring shops, restaurants, a baseball stadium and The Museum of Human Rights.


The Forks Plaza was at the forefront of putting public skateparks in public places and not sticking them behind a Rec centre and forgetting about them.

 The park is a tourist attraction (I've been there 4 times despite living in Toronto, some 2000km or 1200miles away) and even hosted Tony Hawk's Secret Skatepark Tour #3 only a few weeks after opening.




3. Long and Lean
Skateparks hold the advantage amoung sports facilities in that they can be designed to fit into the space available. While most sports require a rectangular playing surfaces (some exceptions, baseball, cricket etc), skateparks can fit in narrow strips of a lawn or even weave between the trees of a park.
The West Shore Skate Spot fits into a 30ft wide strip between a parking lot and road. An integral wall was build on the road side to protect skatepark users and appease neighbourhood concerns.  Other concerns included noise (the park is concrete and 200ft from the closest residence) & size (the city acknowledges this is a small spot but only the beginning of a well funded skatepark network). On the low budget, locals were expecting a quality, 4 obstacle spot. When Transition Construction presented this mini-skatepark design, users were stoked. The construction crew were skaters themselves and made changes to the design on the fly to improve the park.

Caesarea's skatepark fits into a narrow section of the community park and features references to the towns waterfront heritage. 

Jubilee Skate Spot in Georgetown, ON. Small but fun in a neighbourhood park, close enough for a parent to supervise a child on the spot and playground simultaneously. 

Springbank Park, London, ON. The lightning bolt design maximized surface area without having to remove any existing trees.


4. Simplicity Rules!
I believe every skatepark design should begin with the basics. Flat bar, Flat Ledge, Manny Pad & Quarter Pipe(optional). Then continue to build from there.  A basic skate dot can be as little as 2 obstacles, often 1.
Churchill Skatepark, Cambridge, ON.

Garden City Skate Spot is a perfect Ledge/Manny Pad Combo.

Maple Grove Skate Spot features the same style ledge paired with a flat rail with a laser cut support plate.

This style of flat rail can be used to brand a park to the neighbourhood/city or display inspiring words.
 

5. Prince Edward County Skateboard Park
Picton, ON
This park in located in a small town on the shore of Lake Ontario and attracts riders from all over the province. It features an amazing mini-bowl and street section that also has a skate trail that wraps around the bowl.


The Pac-Man Manny Pad spins. Waka Waka

This park is the perfect example of everything mentioned above. It is in a public location and featured prominently by the city in its tourist attraction info. It contains all the features skaters want and way, way more. The park also has a washroom, seasonal canteen and sits next to the playground and splash pad. 
This park is busy all summer. I met up with a friend there last summer, him from Ottawa and I from Toronto.  While skating the bowl I noticed stickers from an Ottawa Skateshop on another skaters board. I struck up a conversation and He explained the he and his daughter traveled to Picton often to skate. I have another acquaintance that hits Picton every year on his annual skatepark road trip.


I hope that works. I'm always up for talking skateparks. 
SpottTheLoonie

Monday, 7 November 2022

Their Best & Worst

 Their Best & Worst...

to the best of my knowledge.

I've been to over 600 skateparks and I do my best to find out all about them. I try to learn about the designers, budgets, build crews and the history of Advocacy, City Council involvement and construction. Some parks are designed by one company and built by another. Sometimes a park is built by General Contractors with mixed results (most are pretty competent, getting better with each project OR the GC subcontracts to a skatepark expert). This is a living document and will be updated/edited as needed.

I have done my best to validate the following claims but (for a lot of reasons) this is an opinion piece. Additionally, a project may have come out poorly due to reasons outside of the designer/builder company's control(I'll do my best to explain). Municipal & City regulations sometimes prevent the Design Company from bidding on the Build part of the project. Some contracts are for Design AND Build. I'm limiting this article to Projects in Ontario.  For additional info on the parks, click highlighted the link.

New Line Skateparks

The Best

It's difficult to choose a 'Best' as New Line has been a leader in quality skateparks for 20 years. I'll go with the Newmarket Outdoor Skatepark. It's modern with great amenities. I believe it was constructed by Pine Valley Corp and Pro-pour Concrete. An in-house build (New Line's own build team) that came out great is Alton. It's small but efficient. 

In 2026, Earl Bales Skatepark opened in Toronto. Melfler won the construction bid and sub-contracted to Canadian Ramp Company. CRC also had HALP Skatepark on the go and had to bring in outside workers which delayed the opening by six months. In the end, the sub-sub-contracted workers produced a great park that New Line designers are happy with. Additional info below.


The Worst
I'd driven four hours out to this park (twice, long story) so it was pretty disappointing. Pictures of the park I'd found looked pretty good but the flaws were evident in person. You won't find this project on New Line's website.
I have a full breakdown of the problems with this park(click the link). It's a shame as the design is good but the construction, done by a different firm, is awful.  The build firm was  Hardcore Shotcrete AKA Canadian Ramp Company.


Spectrum Skateparks
While this company is no longer around, the former prez is still active with freelance projects (before joining Radius and designing the new Pickering Community Skatepark) & they have a large number of parks in Ontario.  Spectrum was around long enough to be part of several skatepark 'eras' so some of the early projects are very 'early 2000's boxy' but modern skateparks with cool features soon followed.

The Best
Campbellford Skatepark is my favorite park. A few marble ledges have been replaced with coping but the park is top tier. A very close second would be Picton(which will come up later).  This park was constructed by Radius Skateparks who partnered on a lot of Spectrum Projects.

The Worst
As per my source, The City of Mississauga wanted a skatepark designed in a way that it could be installed modular or poured. Most of Mississauga's skateparks are pre-fab concrete ramps.  Spectrum had nothing to do with construction. It was built by Rutherford Contracting.


Transition Construction

The Best
I may be biased but the West Shore Skate Spot is sick.  Since this article was first posted Southfields in Caledon was completed as a Design/Build by Transition and it is awesome.

The Worst
Transition does not have many Ontario projects (design) that I know of, but Thamesford has to take last place. It's a good park but the degrading pool coping puts it at the bottom. 


ConcreteSkateConcept.com
I don't know much about this company but their emblem is unmistakable. This one in Port Franks is probably the best I've come across.

The Worst
These pre-cast parks are rare. Both Alymer & Vienna have the same issues as the loser on this list - Dryden. While it has reportedly been fixed, Dryden was the most unrideable park I'd ever been to. It was 4 years old in 2013 when I visited and there was so much damage to the concrete, filler and coping I stayed out of the bowl entirely.


Radius Skateparks
The Best
Radius has built a lot of parks, many designed by other companies, but Haliburton Junction Skatepark is their crown jewel. It contains multiple references to local landmarks, plus it has all the basics.

The Worst
Ok, this one is a bit unfair. Brighton is a 2nd generation park that re-used the existing concrete pad and pre-fab ramps. The addition was designed by New Line but Radius made some on-site changes that made the final result much better (more info in the link). When this is your 'worst', you build pretty awesome parks.



Whatever This Is
I have not been able to find the company that built these ramps that include 'no run up' stair sets, wavy flat bottoms on the mini & a tall and narrow bank to bar. I've found them in Arnprior & Erieau & Sudbury. I think Hanover is the same company which would explain the Ankle Mangler. No Best or Worst. All of them are weird.
The 'Lollipop' in Arnprior (Right side) was so weird but so fun. I'm not sure if it was built professionally. Locals have a new concrete park as of July 2026. 

Red Railed Skatepark
While trying to find info in the manufacturer of Arnprior's ramps (above), I found a playground company (KanGoRoo Playgrounds) that supplied Shelburne's ramps. I hit this park once in 2014 and despite driving through the town regularly, I've never been interested in hitting the park again. Loud, hot, bad dimensions. The killer is the super high flat bar that's busted off on one end. Aluminum Skateparks! Wack!



SKATEWAVE
The Best
Skatewave was discontinued in 2017 but a ton of their products still exist. They feature a lot of butter ledges (recycled plastic) which wears and is easily subjected to damage (melts). This Brampton installation at Gore Meadows was pretty good and well laid out on a fresh asphalt pad...

Until it was moved. The new pad is broom finished concrete, and the broom finish runs perpendicular to the flow of the park.

 The Worst
A Brampton Franken-park. This one at Memorial Arena is made of other decommissioned skateparks in Brampton. These ramps become extremely slick when wet or dusty and break down over time.  Many of the side panels are now missing.


This Stuff
Another mystery modular I've seen around Ontario, this one in Kincardine is the best I've come across. And by best I mean that most of the parts were there & the surface was in good shape. Even with all that, the town has now built a concrete skatepark. 

The Worst
Same ramps in Petawawa on the military base. Rough ground, bad layout & missing parts. Stayner is pretty bad too.
2026 update - I went back to Petawawa with my kids and this park is in even worse shape but I found some branding on the park
Now I can't find any info on RampRider but hopefully that means they are extinct.


Victor Ford & Asscoiates
VF&A are a landscape architecture firm that was involved in several skatepark projects in the late 90's and early 2000's. They, thankfully, have left skateparks to the professionals. Their style of boxed in quarters and safety rails makes their projects distinct.

Their Best
Cummer, I guess. One of the first skateparks in Toronto. It's really bad by modern standards but I remember being hyped on it when it first opened. The box leads right into a quarter pipe and the stair set landing drops into the bowl. Frankly, it kinda looks like a skatepark designed by AI.

Their Worst
I'm so glad I didn't go to college in Ridgetown, for many reasons. This park is so ridiculously terrible that I skated the knocked over jersey barrier.


Papillion Skateparks
Finally, Papillion Skateparks is rocking projects in Ontario. This is the only one so far (they have since done an addition to Alexandria & been attached to design/build in Arnprior. I'd reached out about having them bid for Pickering but at the time, it didn't make financial sense but that may have changed) but I've been to a few of their projects in their home province of Quebec. They are fantastic.  
This is Akwesasne Skatepark on Cornwall Island.


Drop-In Skateparks
With only one Ontario project before this Resume was started, it's hard to judge this Manitoba based company.  The Waterford skatepark has some things I like and some things I don't like. 
I Like the big launch box, the 'A' frame feature and the Snow Plow Hip.  I Love that the locals Love It!
I don't like the Galvanized Coping (it's soft & sticky), the reveal on the coping (there's none), and the rail mounts( the rails are bolted down instead of being in the poured concrete).  Staff also let me know that the design was partially complete when they were hired.
Check my full breakdown HERE

Drop-In Skateparks UPDATE!!!
Drop-In reached out and accepted my feedback very graciously. Their latest Ontario Project is Peterborough's new addition to Bonnerworth Park. It's a gigantic addition to the old park featuring a ton on ledges and rails. Design by CRC but Drop-In handled the build.  There's much better reveal on the coping. The Coping material is way better and all the rails are embedded in the concrete. In 2026, Arrowdale Skate Spot opened and it's fantastic (NL Design, Drop-in Build) and later in the year Kincardine (Design/build) opened.


Stantec
Stantec is an American company that does everything from hospitals to wind farms. They have also done some skateparks in Ontario. They may be associated with American Ramp Company and you'll see how I feel about them next.
 Their best parks are Caledonia and Dunnville.  They were built as a 2 park package deal with Haldimand County. Both are really nice, well built parks with good obstacles and some unique design choices.
Dunnville

Caledonia

Stantec's worst park in Ontario is Nelson Skatepark in Burlington. The city hired Stantec and flew in Pro Skater and skatepark designer Kanten Russell for the design sesh in early 2013. The table I sat with included other skatepark designers and builders. We came up with a linear concept with a mini-ramp on the side. Our design became the official design.  The city didn't approve a proper budget and mini was cut and CRC built with pre-cast ramps.
This is the professional design of our concept. The finished project is Stantec's worst while also being CRC - Precast/PIP Mix's 'best'. It'll come up again below.

Ramparts
Ramparts is a now defunct pre-fab ramp company. I can't find any evidence of them existing past 2014. Here's the old Brooklin, ON park.  It had an update but it's not much better.
I discovered some of their ramps in Ripley, ON in 2024. 



The Canadian Ramp Company
(sigh)

This company produces different kinds of modular ramps (metal, composite and concrete) and poured in place (PIP) Skateparks. They have also worked in Canada under the names Hardcore Skateparks, Hardcore Shotcrete and are the Canadian Division of American Ramp Company.  They also ally with the playground equipment company 'Park N Play Design' to supply their services.
If you can't tell, I'm a little biased against them. I don't hate them. I just want them to do better.
Disclaimer - Some of the following may include ramps from other pre-fab companies. Check out the Perils of Pre-fab. The point here is modular ramp = temporary skateparks (as per The Skatepark Project).
...but here's a fun story. Hardcore Shotcrete built 2 Spectrum designs and put their plaque on the skatepark.  Fast forward a few years and both plaques are gone. In fact, one of the bowls they built is gone too.

Their Best Metal Park
Port Rowan is well layed out on a fresh concrete pad. There's a bit of modular damage but overall, it's pretty good. It is however, quite loud. Like beating on a giant metal drum.  The park in Erin was so loud the town built a 10ft stone wall to block the sound. ASIDE - A study published on the CDC website found that metal ramps produce sound at levels that can damage hearing. When Newcastle proposed a metal park I wrote them a letter about how the features perform in the real world.  Newcastle went with a concrete park by Transition.  Lakeshore moved their park and replaced the old metal ramps with new ones and the Town is now getting noise complaints.

Even a well built metal park can have issues. A new install near Sudbury had the grinding edge lower than the box, leading to the sharp box edge taking a chunk out of my wheel. I've now found this issue at 3 of their new installs.


The Worst Metal Park
Sheldon Park in Burlington is a Certified Piece of Suck. Super rough, seagull poop covered ground with a loud bench and rainbow rail. Rot in Peace. When they installed the Arthur Skatepark, I was bummed the 1/2 deck feature was absent. I later found out it was on backorder. WTF, how does a skatepark feature end up on backorder. Anyways, I checked once installed and discovered the supports were already rusty.

In late 2024 & 2025, CRC installed new ramps in Chesley and Angus. The layout is ok but there are some glaring issues with the coping and the placement of obstacles.
Hey boss, the coping is below the top of the ledge.
So?


Their best composite park.
Updated - West Lions 2.0 is probably the best park CRC has produced in the last 5 years and it's thanks to local advocates and not the installation crew doing Dabs in the van.
Locals advocated for ramp armour over metal and the difference to your ears is unreal.  The park was packed and I skated for an hour. No ringing ears.
The advocates also pushed for core obstacles and things to be able to progress.

Their worst composite park
There are a few cases of pristine ramps but such a stupid layout that no one uses the park. The one in St. George is another case of too much stuff packed into too small a space. But who cares when you're selling ramps. 


Their best pre-cast Concrete Park
I liked Listowel. It has some issues but it was fun.


Their worst pre-cast concrete park
Churchill Meadows Community Common (not to be confused with Churchill Meadows Community Centre some 3km away) is poorly laid out and, due to damage I assume, some of the banks were removed from this section. I've found the bolts that hold the transition plates are easily damaged and they pop up. The city then grinds them smooth. Eventually, there's nothing holding the plate on. Another park lost the plate and the city came in and ground the bolt ends off. Didn't replace the plate though.
As of 2025, the Concrete Pre-cast SOLO line of ramps seem to have been discontinued. Four parks in Burlington has several deteriorating features removed but more on that later.


Precast/PIP mix
Nelson Skatepark (The Stantec design) was supposed to be a PIP park but the city cheaped out and went with this. The original design included a mini-ramp. Follow the link to see all the issues. Oh yeah, this is the 'best'.

The Worst Precast/PIP mix
Hagersville has concrete transition 'plates' for their quarter pipes.

Hagersville 2026 update.  

You know what, Midland is worse. The precast stuff is a big lump in the middle of the park. You need to bomb a rough hill into the park to carry enough speed to get to the stairs/rails on the other side of the obstacle. The bowl (PIP) has no reveal on the coping AKA No-ping. Left to Right - bomb the hill. Right to Left - Drop in on the jersey barrier. FFS.
I went back over a decade later to see if the park was only bad in my memory. It's worse.


Their Best PIP Concrete Park
Picton is a fantastic park that attracts people from all over Ontario and beyond. It was designed by Spectrum and built by CRC. It was so successful because I heard a local skateboarding youth pastor who works at the church across the street was on site every day making sure it was done right.
Sweet Photo courtesy of Session Atlas

EDIT - hours after publishing this article I hit Cornell Community park and found the new skate spot is open. Designed by CRC and built by some good freelance skatepark builders. It's really, really, really slippery but the design and layout is great. Hopefully a winter makes it a little more rideable. The city has already roughed up a small patch of QP when they buffed some tags.  I can't talk shit about this design. If this was the quality they put out every time I wouldn't have such a problem with CRC.
2026- Earl Bales was designed by New Line & tendered to Melfler who subbed to CRC but CRC didn't have enough staff/were too busy botching HALP and after sitting idle for 3-4 weeks brought in Rob Poyner and others (perhaps some Pivot Custom USA guys) and while it was delayed ~6 months, it came out fantastic.  Mr Poyner also did Cornell.



Their Worst PIP Skatepark
Geez, pick one. This was from their own website.
Update - July 2025. Updated website has removed these 3 parks and added the more recent projects I've listed below.  The website photos are all drone shots from above which hides the finer construction flaws.
Let's break them down in order.

First - Tyendinaga Mohawk Territory. Looks great but bad to skate.
With the center island being the highest point, hitting the stairs is difficult. You either have to throw down and pop quickly or carry your speed across the park. There's also the big 3 to parking lot. The kicker to kicker gap is rounded, making it useless. Most of the transition is weird/lumpy/no-ping and it lacks the basic flat bar, ledge & manny pad. I'm fairly sure some of the hubbas were precast. That would explain the 6" flat to hubba on the Left side of this photo.

Second - Aurora Family Leisure Complex. 
-note the creek in front of the QP.  Problems existed before the park opened.
Click the link for more info but here's the breakdown. The park has been deemed structurally unsound following an inspection made after the warranty had expired. A complete re-build was recommended. The project got a budget and made it to the design phase before the Town put out a survey where users requested shade structures, fountains etc.  Council balked at the increased cost and now Aurora is spending $8000 a year in upkeep.

Third - Mclennan Skatepark, Kitchener. Mt Trashmore
Sorry for the bad photos but they show the asphalt was sinking away from the concrete and you can see a corner of the old 'hot tub' quarter that doesn't appear in the website photo. The whole park is built on a former dump. CRC got the build contract for this design (by another company) and didn't use enough pilings. The entire bowl shifted and the 'hot tub' would hold water so the city removed it. The bowl continued to shift and the city had no choice but to decommission and destroy the bowl. It was under 10 years old. 

 While I had fun, Strathroy is another Construction FAIL. No reveal on the coping. The bowl is missing design features and other obstacles are in different locations from the design. Click the link for more. This is now on their website. It has a high middle layout like Tyendinaga.  Skatepark construction is a really hot field right now and their crews are busy.
(a former local just told me a pro skater was brought in for the grand opening. It rained and he thought the park was wack)
who needs room for multiple riders?

CRC was having a hard time finding experienced skatepark builders for this project. That may explain why the project took SIX months and went over budget! The locals I spoke with were not thrilled.
A VERY IMPORTANT UPDATE -2025
Strathroy just after opening in 2022

Here's the same section in 2025.  How do you manage to build a park and either forget to put in a drain OR not grade the concrete properly?

MORE CRC UPDATES
CRC's latest, Tecumseh Skatepark in Sarnia, ON (2023) is a step in the right direction. The quarter pipes have more reveal/bonk on the coping, but there is still major issues other companies don't seem to have. A seam in the bowl is leaking and shown signs of degradation. Follow the link for the full breakdown. This park is now on the CRC website.
wonky reveal

2023
Sleeping Lion Skatepark, Innisfil. - big seams in front of QP's, inconsistent coping & tall rails.

Milverton, ON - Better seams. Better Coping Reveal. Still some lumpy concrete work.

2024
Belleville - A skate dot and an addition to the existing park.  A relapse back to all the old issues plus additional issues when they tried to freestyle. They even had to replace the central feature of the skate spot 3 months after opening.

2025
McDuffe Park Skatepark - I just hit this new spot in Oakville that was completed in 2024. It has good flow and I wouldn't be bummed if it was my local BUT there are some things that should have been caught by the builders.  The majority of seams feel like sidewalk cracks. Skateparks should feel seamless. There's one bumpy seam on the face of the QP.  The biggest fault is the ride-on grind into the stairs. Check out photos by hitting the link.

Lansdowne, Ottawa - Installed a while ago, the website photos look nice but the park has some strange gaps leading to 4 & 5' drops and the filler is deteriorating between pre-cast ramp features.

2025/2026
CRC bit off more than they could chew, getting subs to build in Toronto and Queensville off another companies design.  Earl Bales had almost no work done for a month and was delayed from fall to spring. It's open now and it's great cuz they brought in freelance skatepark builders and sent their core staff to mess up Queensville.  Queensville started in April of '25 and wasn't complete before winter. That didn't stop them from pouring concrete in the cold and now stuff cracked.  The bowl was poured by a different crew and came out great but the street section has puddles and scratchy finishes again.
Another project in Toronto was supposed to be completed last fall but hasn't started yet.
I mean, seriously.  Newline doesn't have these issues.  Drop-in doesn't have these issues. Spectrum, Transition & Radius don't have these issues.  The bowl at HALP, that you brought in better concrete workers, doesn't have these issues.



It seems what CRC needs is a babysitter. They have the ability to make good parks. They just don't seem to care. Multiple attempts to reach out and have a civil conversation have failed.  Drop-in just completed a CRC design and it came out great. Drop-in has also been very responsive to feedback. I've been requesting a dialogue on IG with CRC to no avail. Recently, their VP of Sales/Operations and one of the Lead Contractors started following me on insta. Now the company has started following me. They's also blocked my buddy and removed some critical comments.  Hi Guys. I'd love to have a conversation about skateparks with you.
Reminder - This in an opinion piece.

More reasons to look elsewhere.
CRC appears to have issues with knowing where their skateparks are and what they look like.
This is not the Niagara-on-the-Lake skatepark.  This is Chippewa Lions Park, in Niagara but not NOTL. They did design the concrete NOTL park but Pro-pour built it & it's really nice. Way to go Pro-pour.
Wallace Emerson was moved before it was decommissioned in ~2022. A new concrete park by NewLine is underway as of fall 2024.

This is not Corunna. It is, in fact, Ingersoll. This is also the image CRC uses for their Ingersoll project page.  update - this image has been fixed, NOTL has not.

Same Park - Two Posts.



Lucan, ON - I hit Lucan in early 2025.  What bothered me is the layout on the concrete slab. It's possible the slab was donated by locals to reduce overall costs but there's no reason to put the flat ledge on the edge on the park. The ledge and box/stairs feature being pushed to the edge of the slab makes their grindable edge pointless. The 'Snap' feature is also at the edge of the slab.  There's also an unreachable section of flat behind the mini-ramp. I've been to another project in 2025 & 2026 where there's unreachable concrete corner behind the ramps.

While I'm ranting, I'll throw Shallow Lake in here. Metal Ramps on a fresh concrete pad and a modular concrete pump track. It ain't bad BUT who's idea was it to put pea gravel inside the pump track? wft?

I'm just going to leave this here ( Link ). Care to guess what these Burlington skateparks have in common?
Gone

Gone

Gone, Gone, Screw Head still sticking up.

& Gone