The other day (in Dec 2024) I posted that there are 225 current Toronto Parks & Facilities projects. I went through all of them and this is what I found. There were 2 additional projects that had skate features cut due to lack of support. All Timelines subject to change.
I'd like the city to remember, as it's banning US firms from bidding on projects under $8million, that Canadian Ramp Company is part of American Ramp Company and still often bids for projects using their Joplin, Missouri headquarters address.
Confederation Park
Preferred design option for Confederation Skatepark
Latest News - Confederation Park Skatepark - The city has picked its Skatepark Champions for this project. Online meeting presented the info collected from the Champions and earlier surveys. It included the breakdown of survey results which strongly favoured transition, hence the tranny heavy park concepts. ETA of Winter 2027. Check out the Open House Boards HERE.
Oakwood - St Clair Parks Plan - Lots to go through here but it states "Fairbank Memorial Park has been identified as a good candidate for a skatepark pending further investigation and community engagement." Also, there is a skate dot in Ramsden Park, WTF! (March 2026 - all the coping is missing)
I swear I heard about a skate feature going in here 20yrs ago. Or was that one of my skatepark dreams?
Bartley Park Skate Dot - Park updates with a Playground and Skate Dot. Three concepts for a skate dot; QP spot, Ledge spot or Hybrid of the two. They used my photos in the survey so I had a reason to insert myself😜 The Project Lead was very kind and took in my feedback. The survey results favoured the Hybrid QP/Manny Pad ETA - Summer 2026 (nothing started as of April 1, 2026)
Apted Park in Etobicoke - "The design will be developed through community engagement and is proposed to include a skatepark, volleyball court, a multipurpose sports field, pathways and benches." - ETA End of 2026 ( DEC '25 Update - After absolutely no engagement, the scope of the project appears to have changed focus to a mini-soccer pitch. I'm attempting to find out why the direction changed and how we can gets something skatable in the project or Ward - Email Sent)
Earl Bales Skatepark - Probably the best known current project. The design is finalized. Construction Started Aug, 2025. ETA -Spring '26 as they had a delay bringing in some good crete workers. I was told Designer NewLine is satisfied with the work so far. Follow the build HERE.
1.5-foot bank turn-aroundThree-foot bank turn-around/hipSix-inch slappy curb14-inch flat rail14-inch flat ledgeFour-foot slappy bank with inset six-inch manual pad1.5-foot transition turn-aroundThree-foot transition turn-around1.5-foot table topTwo-foot a-frame with rooftop rail and ledgeFive stair set with down railHubba / out ledgeSlappy out railTwo-foot transition turn-around
Eglinton Park Skate Spot - ETA 'Delayed to Fall 2025' & since they've only cleared some brush as of Sept 6, 2025, I think it's gonna be later.
Now projected for construction from Summer 2026 to Spring 2027
1 of 3 similar options. All 3 have a mini.
Digging deep into the CENTENNIAL PARK MASTER PLAN, the city acknowledges the need for a skatepark but are comparing Centennial with other potential sites in Ward 2. ETA between 2024 & 2028lol Toronto's Northwest & West is terribly underserved. If you're west of Keele, there's 3 parks.
Wallace Emerson - New Bowls and Seasonal Loop are done but the Community Centre is delayed - ETA between Fall 2026 & Winter 2027? Hopefully the exterior opens to the public while programming migrates over slowly. There were 3 concepts & it appears 2 separate bowls are being built.
St James Town Park West - A Skate Area included in final design - ETA Fall 2026 (Construction continues and the park is walled off) Feature 10 - Skateboard Zone.
Elizabeth Simcoe Skate Spot - Update - Survey now closed with 277 Responses!!! Based on the feedback, the project is going PIP but will be delayed to Late Fall 2026 Summer 2027. 1 of 3 metal ramp concepts. I'm pushing for concrete.
Woburn Park Skate Spot - Design SURVEY out til April 15th - The city is comparing this project to West Lodge & Smithfield. Update April 2026 - Some changes to the timeline but at least they have started. This Project Lead ignored a pervious email but is responding now & confirmed she took over Elizabeth Simcoe project) ETA Late Fall 2026. Summer 2027.
Etobicoke City Centre and Dunkip Parks are designed with features.
Small Skate Dot - ETA 2027 2029 2030
North Park - 578 Rustic Road - Informal Skate Feature appears to be in the final design. ETA pushed back to Summer Fall 2026. The site is fenced and a couple benches, rails and concrete have been removed as of April 12, 2026.
#3 - Informal Skate Features.
Projects to watch
Both are pretty close to the new Eglinton skatepark due this year (2025) so I don't expect anything big but a Dot or uncapped ledges would be cool. Preferred design for both coming soon.
Glen Long Park - now that I know about the Ramsden Dot, there's opportunity to request dots or skatable ledges/ rails in sport court projects.
Kirkwood & Mossgrove Parks - 10% of survey respondents requesting a skatepark (closest is Cummer or Hoof). Waiting on design options. ETA Late Fall 2027.
New Parks near Portland St & Audley St - The city outright states there is NOT room for a Full Skateboard Park, Outdoor Pool, Full Basketball court etc. It DOES include wording for a skate spot or dot. Waiting on survey results. ETA 2030.
If you're wondering why a 'Skate Feature' get cuts from the final design, it's the feedback the city gets or does not get. The general public usually opposes Skate Features and the Skaters don't fill out the surveys. If you're wondering why Toronto projects are of mixed quality, it seems like it's really up to the project lead and wether they care about the quality of the skate features or not. It's not for lack of trying by local advocates.
The pickleballers are responding to surveys Five time more than the skaters. And the info is not getting out to the 'skatepark users'. We gotta fight for ourselves. The Toronto Skatepark Strategy is doing a lot to get features included around the city but skaters need to loudly support a project. Show Up or Shut Up, as they say.
Update - Boxing Day 2024.
And show up you did!!! The Elizabeth Simcoe Skate Spot Survey had 277 respondents and now the spot is going concrete!
Finished Projects!
New Park on Brimorton Dr - Near Markham Rd, there is some kind of skate feature included in the final design. It's done now! Feature 9 - Large open lawn/passive play skating feature (informal space for skateboarding and rollerblading with small concrete slopes) - (Alright - mystery solved, it's like 3 sidewalk bumps beside a manny-able ledge. The 'public' side is skate stopped. 2026 ETA was for phase 2. Photos HERE)
Trimmer Skate Spot - North East Scarborough's Rouge River Community Recreation Centre is open. The spot is ok. Click HERE for more.